Skip to main content

Landis+Gyr Module

Sales discontinued on 30.04.2021, support and cloud support guaranteed until 30.03.2025.

The Landis+Gyr module brings the measurement data of the L+G E450 and E350 energy meters into the smart-me Cloud.

The module does not require any additional hardware. It uses the existing WiFi network and connects directly to the smart-me Cloud. This is the easiest way to analyze and optimize energy consumption in real time on your smartphone, tablet or computer.

With a Professional subscription, the meter values can also be queried via the Modbus TCP interface.

Landis+Gyr Module – Figure 1

Functions​

  • Real-time visualization of power, total meter reading (consumption and delivery), tariff 1 and 2, reactive power and reactive energy

  • Automatic storage of meter readings in the cloud

  • Storage and automatic synchronization of measured values in the event of a connection failure

  • Contact output for controlling external devices

  • Encrypted WLAN connection directly to the smart-me Cloud

  • Comprehensive energy data management, automatic billing as well as control and alarms via the smart-me Cloud

  • Easy installation with the free smart-me app for Android and iOS

Video: Installation​

Note: The battery can be removed again after commissioning, as the module is powered by the meter.

Technical data​

FeatureValue
Supported metersL+G E450 and L+G E350 with E35C module
Upload interval5 seconds
Operating voltageprovided by the meter
InterfacesWiFi
Data storage2 months
Firmware updatePossible online
Product certificationCE
WiFi standard802.11 b/g/n
WiFi security standardWEP, WPA, WPA2 (Personal)
Dimensions84 × 40 × 23 mm
Weight37 g
Temperature range−40°C to 70°C
MountingNext to or on the L+G meter

Note: A 9V battery (9-volt block) is required briefly for installation.

Configuring the CII interface​

The CII interface (customer interface) of the Landis+Gyr meter (e.g. E450 or E350) must be activated. Follow the instructions to configure the interface correctly.

CII interface standard configuration (English)

Instructions for configuring the CII customer interface (English)

Changing the upload interval​

  • Log in to the smart-me portal

  • Select the meter

  • Select the gear icon at the top right

  • General settings (Allgemeine Einstellungen)

Landis+Gyr Module – Figure 2

Successor product​

smart-me does not offer a successor product for L&G meters.

If you operate a smart-me ZEV (association for own consumption) and need a new solution for your metering (e.g. HAK), the L&G module must be replaced by a Telstar 80A or Telstar CT.

If measurements are carried out in a private setting for monitoring, home automation, etc., the Telstar 80A or Telstar CT can be installed at any time. If you are looking for a solution with your existing L&G meter, we recommend taking a look at this page. https://gplug.ch/

Downloads​

Data sheet

English

French

Italian

Quick Starter Guide

English

Technical documents

CII interface standard configuration (English)

Instructions for configuring the CII customer interface (English)