Skip to main content

smart-me System and Pico

E-mobility in the smart-me ZEV (association for own consumption) / tenant electricity with the Pico charging station hardware

Schematic diagram of a housing development in a ZEV / tenant electricity setup​

smart-me ZEV and Pico – Figure 1

Description of the load management solution in the metering concept of a ZEV / tenant electricity property​

The load management of the Pico charging station is based on the smart-me meter hardware. This hardware can be used directly as reference points.

If a third-party meter installation is already in place, load management for Picos can also be handled by third-party software instead of the smart-me multilevel load management. You can find more information on this below under "Extended information".

Advantages of smart-me load management:

  • No additional metering hardware required

  • Same manufacturer for the metering hardware and the charging station: top compatibility and reliability

  • Multi-stage, dynamically controlled load management: minimal power losses and high availability

  • Centrally controlled load shedding for the entire installation

  • Solar optimization function optimized for the site or the building

  • Charging group prioritization and passive peak load reduction

Hardware points functionally required for comprehensive load management in a ZEV / tenant electricity setup with smart-me hardware (red arrows):

  • 2x building meter (Telstar 80A or Telstar CT) - Solar optimization point, required for distributing capacity within the site.

  • Optional but recommended: 2x e-mobility meter (Telstar 80A or Telstar CT) - Reference when several charging groups are connected to one outgoing circuit and share its capacity. - Billing measurement for losses and standby energy - Other consumers that are not Pico charging stations can also be taken into account, e.g. garage lighting, sockets, etc.

  • Optional but strongly recommended: 1x site meter (Telstar 80A or Telstar CT) - If one already exists in the ZEV, this point can be taken into account. If there is no site meter, it can be mapped virtually.

Extended information on the load management of the Pico charging station​

Functional description of Pico load management

Compatible third-party load management software

Pico general installation planning: outgoing circuits and fuses.

Billing of e-mobility in the ZEV (association for own consumption) / tenant electricity​

Billing can be done in various ways, each with its specific advantages and disadvantages:

  • Billing with a single-tariff or multi-tariff system in the ZEV with smart-me Billing, either separately or together with the apartment consumption.

  • Billing with a single-tariff system using the post-payment method and the eCarUp backend.

  • Billing with a single tariff using highly automated credit card billing via the eCarUp backend.