Skip to main content

Third-party system and Pico

E-mobility with the smart-me Pico charging station without smart-me ZEV (association for own consumption) / tenant electricity

Schematic diagram of a development without smart-me ZEV / tenant electricity​

Third-party ZEV and Pico – Figure 1

Description of the load management solution in the metering concept without ZEV / tenant electricity or with a third-party provider​

The load management of the Pico charging station is based on the smart-me meter hardware. This hardware can be used directly as reference points.

If a third-party meter installation already exists, load management for Picos can also be handled by third-party software instead of the smart-me multilevel load management. You can find more information on this below under "Extended information".

Advantages of smart-me load management:

  • Same manufacturer for metering hardware and charging station: top compatibility and reliability

  • Multi-stage, dynamically controlled load management: minimal power losses and high availability

  • Centrally controlled load shedding for the entire installation

  • Solar optimization function optimized for the site or for each building

  • Charging group prioritization and passive peak load minimization

Hardware points functionally required for comprehensive load management with smart-me hardware (red arrows):

  • 2x building meter (Telstar 80A or Telstar CT) - Solar optimization point, required to distribute capacity within the site.

  • Optional 2x e-mobility meter (Telstar 80A or Telstar CT) - Reference if several charging groups are connected to one outgoing circuit and share its capacity. - Billing measurement for losses and standby energy - Other consumers that are not Pico charging stations can also be taken into account, e.g. garage lighting

  • Optional if all buildings are metered: 1x site meter (Telstar 80A or Telstar CT) - This point can be formed virtually from the two building meters. The prerequisite is that 100% of the loads on the site are measured by the building meters.

Extended information on load management of the Pico charging station​

Functional description of smart-me Pico load management

Compatible third-party load management software

Billing of e-mobility without ZEV (association for own consumption) / tenant electricity​

Billing can be done in several ways, each with its specific advantages and disadvantages:

  • Billing with a single-tariff or multi-tariff system in the ZEV with smart-me Billing.

  • Billing with a single-tariff system using the post-payment method and the eCarUp Backend.

  • Billing with a single tariff using highly automated credit card billing and the eCarUp Backend.